New Posts New Posts RSS Feed: Rope advice
  FAQ FAQ  Forum Search   Register Register  Login Login

Rope advice

 Post Reply Post Reply Page  <12
Author
dohertpk View Drop Down
Posting king
Posting king


Joined: 28 Sep 12
Online Status: Offline
Posts: 172
Post Options Post Options   Quote dohertpk Quote  Post ReplyReply Direct Link To This Post Topic: Rope advice
    Posted: 21 Sep 14 at 10:25pm
Thanks a mil for that guys - that's very helpful indeed. The thing is, I've never spliced a line before. Is it something I can pick up from YouTube tutorials, or is it something you really only master with years of practice? My control lines are all a continuous set up. The kicker rope needs immediate attention. Do I need to do any splicing to replace that?
Back to Top
Neptune View Drop Down
Really should get out more
Really should get out more
Avatar

Joined: 08 Jun 09
Location: Berkshire United Kingdom
Online Status: Offline
Posts: 1314
Post Options Post Options   Quote Neptune Quote  Post ReplyReply Direct Link To This Post Posted: 21 Sep 14 at 10:14pm
Get the Marlow excel control, it's the one where you splice the outer not inner together. Plenty strong enough and stretch is isn't an issue. My 600 and Musto have both been reroped with it
Musto Skiff and Solo sailor
Back to Top
chris_wht View Drop Down
Groupie
Groupie
Avatar

Joined: 12 May 04
Location: United Kingdom
Online Status: Offline
Posts: 50
Post Options Post Options   Quote chris_wht Quote  Post ReplyReply Direct Link To This Post Posted: 21 Sep 14 at 9:40pm
Excel pro is polyester core and wont make a good splice for your continuous lines.

Ideally you want English Braids / Marlow Continuous control / excel control. These have a dyneema or technora outer and therefore when you splice them you dont have any diameter change.

Aleternatively there are any number of poly cover / dyneema core lines about the can also be continuously spliced, however you will have to taper the outer to allow acess to splice the core. This will mean you do have a diameter change in your lines. Not a major issue, i tended to jut open both cleats between races and run the line round so that the splices were in the takeoffs instead of near the cleats or in a loaded position,

This is slightly less relevant if you dont have cont. lines, but the 600 ideally needs them! and if your re-roping now is the time to put them in..
If oyu want a control line setup diagram for the 600 give me a shout, as i made a somewhat crude one a while back.



Back to Top
dohertpk View Drop Down
Posting king
Posting king


Joined: 28 Sep 12
Online Status: Offline
Posts: 172
Post Options Post Options   Quote dohertpk Quote  Post ReplyReply Direct Link To This Post Posted: 21 Sep 14 at 8:34pm
Hey all,
Hope you had a great Bart's Bash! Looking to re-rope my 600. What kind of rope would you recommend for the control lines? I need something that's not going to chafe and abrade easily. I've been looking at the Marlow Excel Pro but any advice needed.

Best,
Peter
Back to Top
 Post Reply Post Reply Page  <12

Forum Jump Forum Permissions View Drop Down

Bulletin Board Software by Web Wiz Forums® version 9.665y
Copyright ©2001-2010 Web Wiz
Change your personal settings, or read our privacy policy