New Posts New Posts RSS Feed: 29er Jib dimensions
  FAQ FAQ  Forum Search   Register Register  Login Login

29er Jib dimensions

 Post Reply Post Reply Page  12>
Author
Jack Sparrow View Drop Down
Really should get out more
Really should get out more
Avatar

Joined: 08 Feb 05
Location: United Kingdom
Online Status: Offline
Posts: 2965
Post Options Post Options   Quote Jack Sparrow Quote  Post ReplyReply Direct Link To This Post Topic: 29er Jib dimensions
    Posted: 16 Apr 18 at 9:44am
Originally posted by Granite

Agree that a bendy bit of ply would work to transfer the hole positions. Just need to decide what track to get.
I fancied a new build and liked the look of the Everest 1, the build method was also interesting and helped make a quick build.

Only kidding... I think Clive Everest's UKCherub should have been built more by now. A great bit of production design. Good luck with it, it looks great from what I can see.
Back to Top
Granite View Drop Down
Far too distracted from work
Far too distracted from work
Avatar

Joined: 12 May 04
Location: Scotland
Online Status: Offline
Posts: 476
Post Options Post Options   Quote Granite Quote  Post ReplyReply Direct Link To This Post Posted: 14 Apr 18 at 9:29pm
Agree that a bendy bit of ply would work to transfer the hole positions. Just need to decide what track to get.
I fancied a new build and liked the look of the Everest 1, the build method was also interesting and helped make a quick build.
If it doesn't break it's too heavy; if it does it wasn't built right
Back to Top
Jack Sparrow View Drop Down
Really should get out more
Really should get out more
Avatar

Joined: 08 Feb 05
Location: United Kingdom
Online Status: Offline
Posts: 2965
Post Options Post Options   Quote Jack Sparrow Quote  Post ReplyReply Direct Link To This Post Posted: 13 Apr 18 at 2:47pm
Oh BTW, didn't fancy a Banshee then. LOL ;-)
Back to Top
Jack Sparrow View Drop Down
Really should get out more
Really should get out more
Avatar

Joined: 08 Feb 05
Location: United Kingdom
Online Status: Offline
Posts: 2965
Post Options Post Options   Quote Jack Sparrow Quote  Post ReplyReply Direct Link To This Post Posted: 13 Apr 18 at 2:46pm
Originally posted by mozzy

Radius doesn't look very tight. I doubt you'l get kinking at the holes. Certainly looks a wider radius than the 29er track, and I never had a problem screwing that down from straight. 

I'd just work from one side to the other, drilling and screwing down as you go. 

+1

Or just mark the track holes on Jims bit of ply. Clamp it to the track bed which should transfer the eventual position of the track holes when bent? Then drill holes. Bolt down track. Or have I just repeated what you said Jim?
Back to Top
JimC View Drop Down
Really should get out more
Really should get out more
Avatar

Joined: 17 May 04
Location: United Kingdom
Online Status: Offline
Posts: 6662
Post Options Post Options   Quote JimC Quote  Post ReplyReply Direct Link To This Post Posted: 13 Apr 18 at 1:27pm
Would it be worth cutting some narrow strips of ply the length of the track and using them as a tool to pull it down? Presumably you're going to have a hole each side of the centreline which would be straightforward to locate. If you pulled down on those and then clamp it in place and get the bend sorted out you could then mark the rest of the holes from the track in position.
Back to Top
Guests View Drop Down
Guest Group
Guest Group
Post Options Post Options   Quote Guests Quote  Post ReplyReply Direct Link To This Post Posted: 13 Apr 18 at 1:15pm
Radius doesn't look very tight. I doubt you'l get kinking at the holes. Certainly looks a wider radius than the 29er track, and I never had a problem screwing that down from straight. 

I'd just work from one side to the other, drilling and screwing down as you go. 
Back to Top
Granite View Drop Down
Far too distracted from work
Far too distracted from work
Avatar

Joined: 12 May 04
Location: Scotland
Online Status: Offline
Posts: 476
Post Options Post Options   Quote Granite Quote  Post ReplyReply Direct Link To This Post Posted: 13 Apr 18 at 12:45pm
There are no holes currently, just the support.


I think that it needs to have bolts in the holes when the track is bent to avoid it kinking at the bolt holes. I could use the pulling in technique but would need to transfer the bent hole positions across to the boat before bendint the track. alternativly I would fit bolts in all the holes and bend it by hand or with clamps 
If it doesn't break it's too heavy; if it does it wasn't built right
Back to Top
Jack Sparrow View Drop Down
Really should get out more
Really should get out more
Avatar

Joined: 08 Feb 05
Location: United Kingdom
Online Status: Offline
Posts: 2965
Post Options Post Options   Quote Jack Sparrow Quote  Post ReplyReply Direct Link To This Post Posted: 12 Apr 18 at 12:21pm
Originally posted by Granite

Thanks,
There is a support for the full length of the track so I could go the 29er route, or another small soft track like the ronstan one.
The difficulty with pulling it into position is marking the holes so they line up once it is bent, would probably have to make a card template and transfer using that.

I had looked at the RS800 one but it is about three times the price.

Surely clamping down to your track bed, would solve this (G-Clamp, Trigger Clamps etc). Then drill holes? Or does the track bed have a compound curve?
Back to Top
Guests View Drop Down
Guest Group
Guest Group
Post Options Post Options   Quote Guests Quote  Post ReplyReply Direct Link To This Post Posted: 12 Apr 18 at 11:58am
Do you have holes already in the deck that you need to match up to track? It might be easier to fill any old holes then drill and screw as you go along from one side to another. 

The 29ers have gone through a few different suppliers for jib track and car. Use to be ronstan (freddy), then harken and I think they're on holt or allen now. 
Back to Top
Granite View Drop Down
Far too distracted from work
Far too distracted from work
Avatar

Joined: 12 May 04
Location: Scotland
Online Status: Offline
Posts: 476
Post Options Post Options   Quote Granite Quote  Post ReplyReply Direct Link To This Post Posted: 12 Apr 18 at 11:31am
Thanks,
There is a support for the full length of the track so I could go the 29er route, or another small soft track like the ronstan one.
The difficulty with pulling it into position is marking the holes so they line up once it is bent, would probably have to make a card template and transfer using that.

I had looked at the RS800 one but it is about three times the price.


If it doesn't break it's too heavy; if it does it wasn't built right
Back to Top
 Post Reply Post Reply Page  12>

Forum Jump Forum Permissions View Drop Down

Bulletin Board Software by Web Wiz Forums® version 9.665y
Copyright ©2001-2010 Web Wiz
Change your personal settings, or read our privacy policy